Consumer Code for New Homes (CCNH)
The Consumer Code for New Homes (CCNH) provides mandatory requirements for all registered developers. Approved by the Chartered Trading Standards Institute, the code was established to ensure best practice and set higher standards for the marketing, selling and purchasing of new homes.
A home will be covered by CCNH if it has been built and sold by a registered member, and the provisions of the code apply to the new home for 2 years after the date of completion of the sale.
The code covers the following stages in the new home buying process:
- Pre-purchase stage.
- Contract exchange stage.
- Handover and after sales.
- Complaints and disputes.
If a developer breaches the code, a range of sanctions can be applied, including removal from the register of members.
The code does not affect the legal rights of the buyer, or legislation regarding the sale and marketing of new homes.
The code sets out various assurances to the buyers of new homes, which include:
- Fair treatment by the developer (and agent).
- Legal and professional status of the developer.
- Standards of construction.
- Expected service levels.
- Maintenance requirements.
- Access to speedy, low-cost dispute resolution arrangements.
- Support for people in a vulnerable position.
The code does not apply to:
- Second-hand properties.
- New-build properties not sold by a registered developer.
- Properties remaining under the developer’s ownership.
- Properties acquired by social landlords for rent.
- Properties acquired by partnerships, commercial landlords, corporate bodies, charities, and so on.
- Properties built by self-builders.
- Properties assigned or sub-sold by an investor to a third party
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Affordable housing.
- Consumer Code for Home Builders.
- Developer.
- Development appraisal.
- National Housing Taskforce.
- National Planning Policy Framework.
- New Homes Bonus.
- Starter homes.
[edit] External resources
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.